Six steps to the perfect floor.
Measure the room, calculate the material, set the centre line, pick the method, plan the edges, order. No wrong buys, no surprises.
The difference between "ordered the floor and it fits" and "I'm five tiles short" is 20 minutes of planning. We'll walk you through them.
6 steps to the right order
Measure the room
Calculate the material you need
Set the centre line
Choose the installation method
Plan the perimeter finish
Checklist before ordering
Area & tile calculator
Choose your floor and enter the room dimensions. We'll work out the area, waste, tile count and estimate the price.
1. Choose your floor
2. Room dimensions
3. Result
Estimate excluding shipping and any volume discounts. Get in touch for a binding quote.
Delivery, weight, pick-up
The haulier delivers to the kerbside at your delivery address – not into the basement. From there you carry it yourself. Reckon with around 20 kg per 1×1 m tile at 25 mm: 30 m² come to around 600 kg, about an hour's work for two people.
The alternative: pick-up from us in Pfäffikon. Many customers do that – and find it worth mentioning in their reviews.
Installation methods compared directly
| Method | Effort | Removable without residue | When to use |
|---|---|---|---|
| Connect system (HG PRO CONNECT 25) | Medium, no tools | Yes | Rented premises, heavy use, rock solid hold wanted |
| Puzzle system (CORE 15 Puzzle, LITE 6 Puzzle) | Low, no tools | Yes | Home gym, temporary areas |
| Loose installation (tiles without connector) | Low, no tools | Yes | Wall to wall, under heavy equipment |
| Bonding | High, adhesive/rails | No | Permanent installation, studio area |
Ramps and corners – don't forget them
Step-free transitions and clean external corners are usually only noticed once they're missing. Trip hazards, open edges that curl up, a crooked transition to another flooring – all of it comes from missing ramps and corners. Factor them in from the start.
Subfloor and room – three questions from our consultations
Three questions about the floor that keep reaching us. All of it comes from consultations and customer feedback – not from measurements.
Damp basement. It is rarely an issue, and we do not measure anything for it. Lay the floor loose, not glued, and lift a tile every now and then to check underneath. With HG PRO CONNECT 25, air can circulate under the studded underside – it is also the floor we recommend on a damp subfloor. The 15 mm lines and ECO PRO 25 lie flat.
Underfloor heating. Yes, that works – we have never had a complaint about a cold room. Three things, in this order:
- Never screw into the floor. Hitting a heating pipe means serious damage straight away.
- No dropping like in weightlifting without additional damping (Shock Absorb, Dropping Mat). Setting the bar down normally is fine.
- The room can get slightly cooler. In practice that has never been a problem.
Our recommendation here too: HG PRO CONNECT 25. There is no need to drop to 15 mm just because of the heating.
Rack and rig. Whether the floor or the rack goes in first rarely matters. What counts is the hold: in a CrossFit gym or larger studio you cut out the floor under the feet of the rig and bolt the rig directly into the concrete – no soft layer in between, otherwise it wobbles. In a home gym it is enough to stand the rack on the floor and screw through the tile. Cutting out gives the best hold but is not essential; some racks stand securely without being bolted down. With underfloor heating: no screws, the rack stands free.
One note up front: this is not millimetre work
Rubber tiles have production-related tolerances – up to 1.5 percent deviation in edge length. That's normal and comes with the material. Rubber reacts to temperature, humidity, transport and sunlight.
That's why these are the two most important measures during installation:
- Staggered laying pattern: evens out small deviations, doesn't show visually.
- 48 h acclimatisation before and after installation: at 18–26 °C, tiles laid out flat and individually.
With these two points you get a clean joint pattern every time – even if individual tiles deviate slightly.
Don't fancy doing the installation?
We get it. We have partner companies in Switzerland we can recommend, or we come by ourselves – depending on project size and region. A call or a message with a dimensioned drawing is enough.
Common questions about planning
How precisely do I have to measure?
What happens if I order too many tiles?
Can I combine different thicknesses?
Do I need a professional for the installation?
What does installation by you cost?
Why don't all tiles fit to the millimetre?
Ready to order?
If you're still unsure which line fits: the comparison page has the answer.